Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes clean and video approximately 22,000 LF of 8 and 10 gravity sewer lines; video and inspect condition of existing manholes, approximately 38 manholes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consist of sanitary sewer improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 9, 2026
Release: Jan 16, 2026
Close: Feb 9, 2026
Project consist of sanitary sewer improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sanitary sewer improvements.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
Work includes sanitary sewer improvements.
AvailableWork include Rehabilitate approximately 13,829 feet of sanitary sewer with cured-in-place pipe lining, including 32 manholes and 104 sanitary laterals. Replace approximately 1,559 feet of sanitary sewer, including 8 manholes and 20 sewer laterals. Install approximately 900 feet of new water lines. And full-depth replacement of approximately 900 feet of roadway
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work include Rehabilitate approximately 13,829 feet of sanitary sewer with cured-in-place pipe lining, including 32 manholes and 104 sanitary laterals. Replace approximately 1,559 feet of sanitary sewer, including 8 manholes and 20 sewer laterals. Install approximately 900 feet of new water lines. And full-depth replacement of approximately 900 feet of roadway
AvailableReplacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
Replacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →