Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Pittston
Provide window and partial sidewalk replacement. Contract no. 1: general construction contract no. 2: asbestos abatement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Jefferson County Public Schools
Partial window replacement project.
Posted Date
Nov 16, 2025
Due Date
Dec 11, 2025
Release: Nov 16, 2025
Jefferson County Public Schools
Close: Dec 11, 2025
Partial window replacement project.
AvailableUniversity Of Toledo
Provide window replacement. The project will remove and replace windows.
Posted Date
-
Due Date
Nov 18, 2025
University Of Toledo
Close: Nov 18, 2025
Provide window replacement. The project will remove and replace windows.
Town of Farmington
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Town of Farmington
Close: Dec 2, 2025
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
AvailableCity of New York
Work include elevator replacement shall include new elevator cars and hoistway equipment, liftnet system, controllers, power units, sump pump, and other related required items. Provide mechanical work for new heating ventilating and air conditioning (hvac) for the elevator machine room hvac work. Provide electrical work to support installation of the new elevators and elevator machine room hvac work.
Posted Date
Jul 9, 2025
Due Date
Nov 20, 2025
Release: Jul 9, 2025
City of New York
Close: Nov 20, 2025
Work include elevator replacement shall include new elevator cars and hoistway equipment, liftnet system, controllers, power units, sump pump, and other related required items. Provide mechanical work for new heating ventilating and air conditioning (hvac) for the elevator machine room hvac work. Provide electrical work to support installation of the new elevators and elevator machine room hvac work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis