Summary
Work includes demolition and removal of existing retaining walls, structures, foundations, and utilities; construction of approx 8,500 SF pre-engineered metal building (pemb) with concrete foundations including incidental ventilation fan and louvers; installation of an 8' x 30' pre-fabricated climate controlled container office with bathroom to be used as scale house including incidental plumbing and well pump connections. Salvage existing trash compactor unit and re-install in new building including steel fabricated garbage chute; relocation of existing 70' truck scale; salvage existing scale, install new concrete foundations. See outside link.