Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Toledo is soliciting statements of qualifications for a progressive design-build firm to perform pre-construction, final design, construction, and post-construction services for the Windermere Pumping Station Improvements project. Work includes replacement and upgrades of bar screens, pumps, motors, electrical systems, architectural and HVAC improvements, and LED lighting, with an estimated construction cost of $10–$12 million. Selection will be a two-phase process (SOQs first, then technical and pricing proposals).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Premium
Access the largest public sector contact database
Close: Jan 14, 2026
Pumping station reliability improvements: Contract 26-001 – General Construction, Contract 26-002 – Electrical Construction, Contract 26-003 – HVAC Construction. The Project generally comprises modifications to the existing Pump Station which pumps 30 MGD of raw water from the Susquehanna River to the Octoraro Water Treatment Plant. Modifications include but are not limited to, replacement of three existing pumps and installation of two new generators. The existing dry chemical system will also be replaced with a liquid chemical system. Electrical work includes the replacement in kind of the existing transformer as well as the installation of a new switchgear building to hold new switchgear equipment and VFDs for the new pumps. Work also includes the demolition of an existing building and the addition of a small building adjacent to the existing pump station for storage and handling of the liquid chemical system.
AvailableWastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
Close: Dec 12, 2025
Wastewater Collection System Improvements, Replace Pumping Station ″A″, 2023 Community Development Block Grant.
Rehabilitation of the Trenton Street Sewage Pumping Station, including a new precast wet well, pumps, mechanical, electrical, and site improvements.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Rehabilitation of the Trenton Street Sewage Pumping Station, including a new precast wet well, pumps, mechanical, electrical, and site improvements.
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis