Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of approx, furnishing all products and performing all labor to construct the sidewalks, curb and gutter, storm drainage, concrete walking paths, and any other items shown or implied in the Construction Drawings. See outside link for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of clearing and grubbing; 2,000 CY of unclassified excavation; 5,900 SY of subgrade preparation; 4,900 SY of base course 4"; 1,000 SY of base course 6"; 4,900 SY of prime coat material; 4,900 SY of miscellaneous paving; 1 LS of removal of structures and obstructions; 500 LF of composted mulch socks; 1,010 SY of concrete sidewalk 4"; 370 LF of concrete vertical curb and gutter type b 6" x 24"; 1 LS of mobilization; 6 EA of manhole adjustment; 7 EA of remove & relocate fire hydrant; 170 LF of polyvinyl chloride pipe-6"; etc, see attached file.
AvailableRunning and athletic tracks, and multi-use paths.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Running and athletic tracks, and multi-use paths.
AvailableStormwater and multi-use pathway project.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
Stormwater and multi-use pathway project.
AvailableConsists of placing asphaltic concrete pavement for multi-use pathway. The work also includes grading, drainage pipe, pathway signing and pavement markings, landscaping, and other related work.
Posted Date
Dec 10, 2025
Due Date
Feb 13, 2026
Release: Dec 10, 2025
Close: Feb 13, 2026
Consists of placing asphaltic concrete pavement for multi-use pathway. The work also includes grading, drainage pipe, pathway signing and pavement markings, landscaping, and other related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →