Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Whittier Narrows Splash Pad (Spec No. 7835) is a public construction procurement by the Los Angeles County Department of Public Works to construct and install a splash pad at 750 S. Santa Anita Ave, El Monte, CA. A non-mandatory proposers conference is scheduled for January 27, 2026 at 10:00 AM, and the bid closing date/time is February 17, 2026 at 10:00 AM. The estimated project value is $2,430,000 and the Project Manual is listed as 'forthcoming' on the buyer's site (no primary solicitation PDF was available at time of capture).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a splash pad facility. The project consists of the design, permitting, and construction of a splash pad, including all mechanical, electrical, plumbing, filtration, controls, spray features and surfacing. Demolition of the existing pool has already been completed.
Posted Date
Dec 31, 2025
Due Date
Jan 19, 2026
Release: Dec 31, 2025
Close: Jan 19, 2026
Construction of a splash pad facility. The project consists of the design, permitting, and construction of a splash pad, including all mechanical, electrical, plumbing, filtration, controls, spray features and surfacing. Demolition of the existing pool has already been completed.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
Posted Date
Dec 24, 2025
Due Date
Jan 31, 2026
Release: Dec 24, 2025
Close: Jan 31, 2026
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
AvailableWork consists of full removal and replacement of the existing splash pad. This includes demolition and disposal of all existing spray features, piping, valves, controllers, and associated equipment. The new installation shall include a like-for-like splash pad with new concrete slab and non-skid coating, a push button activator, new spray features (similar to the previous water features), trench drainage systems, and all supporting infrastructure. Utility work includes trenching and connection from the main water line to a new above ground valve cabinet to new 2" water lines to the splash pad system, as well as sewer connections for drainage.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Work consists of full removal and replacement of the existing splash pad. This includes demolition and disposal of all existing spray features, piping, valves, controllers, and associated equipment. The new installation shall include a like-for-like splash pad with new concrete slab and non-skid coating, a push button activator, new spray features (similar to the previous water features), trench drainage systems, and all supporting infrastructure. Utility work includes trenching and connection from the main water line to a new above ground valve cabinet to new 2" water lines to the splash pad system, as well as sewer connections for drainage.
AvailableRequest for Qualifications for a General Contractor to renovate the Pomonok Houses Splash Pad and Playground.
Posted Date
Dec 23, 2025
Due Date
Jan 31, 2026
Release: Dec 23, 2025
Close: Jan 31, 2026
Request for Qualifications for a General Contractor to renovate the Pomonok Houses Splash Pad and Playground.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →