Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be done includes, but is not limited to, the following: Concrete including demo, sidewalks, curb & gutter, asphalt including demo, signage and other items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Village of Kinderhook is soliciting bids for the Albany Avenue Pedestrian and Bicycle Improvements project, which involves constructing approximately 0.30 miles of concrete sidewalks and stone curbing. The project includes drainage improvements and the installation of new crosswalks to connect with the Albany Hudson Electric Trail. This federally funded project must adhere to NYSDOT standards and is expected to be substantially completed within 240 calendar days.
Posted Date
Jan 22, 2026
Due Date
Feb 19, 2026
Release: Jan 22, 2026
Close: Feb 19, 2026
The Village of Kinderhook is soliciting bids for the Albany Avenue Pedestrian and Bicycle Improvements project, which involves constructing approximately 0.30 miles of concrete sidewalks and stone curbing. The project includes drainage improvements and the installation of new crosswalks to connect with the Albany Hudson Electric Trail. This federally funded project must adhere to NYSDOT standards and is expected to be substantially completed within 240 calendar days.
AvailableWork includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableThe City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
The City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
AvailableThe City of Jurupa Valley is soliciting bids for the Pacific Avenue Pedestrian Bicycle Improvements PH2 Rebid 23115 project to widen and reconstruct roadway segments and install curb, gutter, and sidewalks. The scope includes building retaining walls, ADA ramps, and storm drainage connections to the Sunnyslope Channel. All work must comply with specific Bid Documents, Special Provisions, and State Standard Plans and Specifications.
Posted Date
Jan 22, 2026
Due Date
Feb 25, 2026
Release: Jan 22, 2026
Close: Feb 25, 2026
The City of Jurupa Valley is soliciting bids for the Pacific Avenue Pedestrian Bicycle Improvements PH2 Rebid 23115 project to widen and reconstruct roadway segments and install curb, gutter, and sidewalks. The scope includes building retaining walls, ADA ramps, and storm drainage connections to the Sunnyslope Channel. All work must comply with specific Bid Documents, Special Provisions, and State Standard Plans and Specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis