Missouri Department of Conservation
Construction survey staking, information sign, erosion control, clearing, grubbing, site grading, earth dam excavation, storage and spoil of excavated material, fill placement and compaction, removal of existing spillway and boat ramp, construction of new spillway, articulated concrete block, reinforced concrete, railing, dewatering, lake drawdown, lake filling, rip-rap, pipe gate, signs, and seed and mulch.
City of York
The project will consist of the installation and maintenance of erosion and sedimentation control devices, lowering pond water surface (if necessary), establish a staging area, clearing and grubbing of existing trees, brush and other vegetation as necessary, grade the emergency spillway area, construct the new concrete emergency spillway including side walls, underdrains and dissipater blocks, refurbish the primary spillway by lowering each of the four weirs, replace new drain valves, install new trash rack, raise the crest of the dam, and fine grade, seed, and mat all disturbed areas after construction activities have been completed. Provide the owner with a topographic survey of all new reconstructed areas, maintain reservoir water elevation until "approval to impound" is acquired from the scdhec, and finally remove all equipment and materials from the project site.
City of Dover
Work consist of repairs to boat ramp, add rip rap to earth embankment on upstream slope and downstream of the downstream apron, repair undermined sidewalk, repairing spalls, cracks, pop outs, scaling and delamination in concrete wingwalls, repairs to fence extensions and railings, investigating source of leaking water and condition of concrete wingwall to determine appropriate repair, repairing leaks and welds on the fish ladder, repairs to pedestrian walkway and repair opening between trash rack panels on the outlet works.
Evergreen Metropolitan District
Diverting bear creek and dewatering the work area in accordance with applicable permit requirements. Lockout/tagout of the upstream outlet works gate and accessing the downstream outlet works vault. Excavating the existing channel bottom downstream of the outlet works to expose the existing concrete outfall. Draining and demolishing existing steel pipe, valves, and fittings inside the outlet works vault.
Release
Oct 01, 2025
Close
Nov 06, 2025