Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
School paint room renovation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide UAB Shelby Room 120 Electron Microscope Room Renovation.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Provide UAB Shelby Room 120 Electron Microscope Room Renovation.
Premium
Access the largest public sector contact database
Provide park fitness locker room renovation.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
Provide park fitness locker room renovation.
AvailableProject consists of renovation of approximately 4,000 square feet of high school locker rooms. Facility construction includes concrete slabs & benches, cmu and brick masonry, wood casework, solid surface material, hollow metal and flush wood openings, gypsum board assemblies. Finishes and accessories include tiling, acoustical ceiling tiles, fluid applied flooring, paint, door signage, toilet accessories, metal lockers and wire shelving. Plumbing work includes piping and fixtures. Mechanical work includes air handling unit, energy recovery unit, condensing units. Electrical work includes lighting, power, and fire detection.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Project consists of renovation of approximately 4,000 square feet of high school locker rooms. Facility construction includes concrete slabs & benches, cmu and brick masonry, wood casework, solid surface material, hollow metal and flush wood openings, gypsum board assemblies. Finishes and accessories include tiling, acoustical ceiling tiles, fluid applied flooring, paint, door signage, toilet accessories, metal lockers and wire shelving. Plumbing work includes piping and fixtures. Mechanical work includes air handling unit, energy recovery unit, condensing units. Electrical work includes lighting, power, and fire detection.
AvailableFurnish and install AV equipment associated with the room addition and renovation project.
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Furnish and install AV equipment associated with the room addition and renovation project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis