Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of project: wastewater treatment plant rehabilitation including cleaning, blasting and recoating of existing on-site lift station wet well, piping, valves, and all appurtenances; bypass pumping; repair of cracks on walls of aeration basins, digester basins, clarifiers and chlorine contact basins, replacement of various valves at basins and piping; installation on site bathroom and appurtenances, rehabilitation of influent manhole and off site lift station rehabilitation including cleaning, blasting and recoating of existing lift station wet well, piping, valves, manhole and electrical improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Work includes demolition of existing duplex submersible lift station, construction of complete duplex submersible lift station, including wet well, valve, chamber, sanitary sewer, force main, bypass connection, permanent standby generator, pumps, piping, valves, electrical, controls, and instrumentation; demolition of six (6) existing control structures, demolition of sixteen (16) existing gates, demolition (removal or flow fill) of approx 1,940 LF of transfer piping, installation of six (6) control structures, installation of approx 2,060 LF of transfer piping, installation of nineteen (19) gate valves and one (1) slide gate in control structures. See attached file.
AvailableRehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Rehabilitation of the secondary clarifiers at the wastewater treatment plant. The project includes structural, process, and electrical rehabilitation of the lower plant secondary clarifiers no. 27 and no. 37 to improve operational reliability and performance.
AvailableOperation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Operation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
AvailableInstallation of generator for lift station and wastewater treatment plant improvements.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Installation of generator for lift station and wastewater treatment plant improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis