Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the complete replacement of a final effluent pumping station, replacement of secondary clarifier mechanisms, piping improvements, site grading and landscaping, and associated structural and electrical work at the West Point Treatment Plant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes waste water treatment plant improvements.
AvailableWork include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of heating, ventilation and air conditioning (hvac) system for the proposed water treatment plant and raw water pump station.
Available1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →