Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes appprox 800 CY general excavation; 28 LF of 12" RPVCP storm drain pipe; 250 SY 2" asphalt concrete patching. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project consists of 2” of 9.5mm by 5.5’ of asphalt on the walking trail at Park.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Project consists of 2” of 9.5mm by 5.5’ of asphalt on the walking trail at Park.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Cochran, GA is soliciting bids for construction of a concrete walking trail and installation of playground equipment and grills at Willie Basby Park, including traffic control, erosion and sediment control, clearing, grading, stormwater installations, traffic striping, and landscaping. Bidders must provide all materials, labor, tools, equipment, and related services; a bid bond of not less than 5% is required and the successful bidder must furnish 100% Performance and Payment Bonds and required insurance. Bidding opened 2026-01-15 and the solicitation closes 2026-02-10 (per the official event detail link on the Georgia Procurement Registry).
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
The City of Cochran, GA is soliciting bids for construction of a concrete walking trail and installation of playground equipment and grills at Willie Basby Park, including traffic control, erosion and sediment control, clearing, grading, stormwater installations, traffic striping, and landscaping. Bidders must provide all materials, labor, tools, equipment, and related services; a bid bond of not less than 5% is required and the successful bidder must furnish 100% Performance and Payment Bonds and required insurance. Bidding opened 2026-01-15 and the solicitation closes 2026-02-10 (per the official event detail link on the Georgia Procurement Registry).
AvailableThe City of Jonesboro is soliciting bids for trail improvements at Craighead Forest Park, including stabilizing and constructing 8,899 linear feet of soft‑surface trail and installing 5,272 square feet of revetment mat. The trail will utilize three different cross sections as shown in the project details at 411 E Craighead Forest Road. Bids are due February 18, 2026 at 2:00 PM Central, and an advertisement is available with specifications obtainable for a fee.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
The City of Jonesboro is soliciting bids for trail improvements at Craighead Forest Park, including stabilizing and constructing 8,899 linear feet of soft‑surface trail and installing 5,272 square feet of revetment mat. The trail will utilize three different cross sections as shown in the project details at 411 E Craighead Forest Road. Bids are due February 18, 2026 at 2:00 PM Central, and an advertisement is available with specifications obtainable for a fee.
AvailableThe Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →