Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Springfield, Ohio is soliciting electronic bids for the West High Street Utility Upgrade. Bids are due via BidExpress by 10:00 AM local time on January 16, 2026, with a virtual bid opening. The project is funded by the Ohio Environmental Protection Agency and is subject to Davis‑Bacon prevailing wage requirements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1 LS clearing and grubbing; 74 LF pipe removed 24" and under; 158 SY pavement restoration, type a; 208 SF 6" concrete drive; 11 EA curb ramp; 150 LF combination curb and gutter, type 2; 100 LF 6" base pipe underdrain; 13 EA manhole, (springfield mh-1); 16 EA catch basin, (springfield cb-1); 1 EA manhole, adjusted to grade; 63 LF stop line.
Posted Date
Dec 29, 2025
Due Date
Jan 16, 2026
Release: Dec 29, 2025
Close: Jan 16, 2026
Work includes 1 LS clearing and grubbing; 74 LF pipe removed 24" and under; 158 SY pavement restoration, type a; 208 SF 6" concrete drive; 11 EA curb ramp; 150 LF combination curb and gutter, type 2; 100 LF 6" base pipe underdrain; 13 EA manhole, (springfield mh-1); 16 EA catch basin, (springfield cb-1); 1 EA manhole, adjusted to grade; 63 LF stop line.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes residential street light system upgrade.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Project includes residential street light system upgrade.
AvailableSeek a qualified Contractor to upgrade existing Building Automation System (BAS) JACE controllers. Scope includes hardware replacement (as needed), station migration, driver updates, point mapping, graphics modernization, network reconfiguration, commissioning, and training.
Posted Date
Dec 16, 2025
Due Date
Jan 6, 2026
Release: Dec 16, 2025
Close: Jan 6, 2026
Seek a qualified Contractor to upgrade existing Building Automation System (BAS) JACE controllers. Scope includes hardware replacement (as needed), station migration, driver updates, point mapping, graphics modernization, network reconfiguration, commissioning, and training.
AvailableThe project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →