Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Elkin
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank that serves the western end of Elkin, the eastern part of Wilkes County, and the Town of Ronda with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Elkin
Contract 2, Water Transmission Main includes the replacement and upsizing of nearby water main supply lines, involving approx 5,000 LF of 12" ductile iron pipe (DIP) water main, 2,850 LF of 10" DIP water main.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Town of Elkin
Close: Jan 15, 2026
Contract 2, Water Transmission Main includes the replacement and upsizing of nearby water main supply lines, involving approx 5,000 LF of 12" ductile iron pipe (DIP) water main, 2,850 LF of 10" DIP water main.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Bloomfield
The project consists of replacing the 1,000,000-gallon water storage tank known as the West Tank or Wilderness Tank.
Posted Date
Sep 9, 2025
Due Date
Dec 3, 2025
Release: Sep 9, 2025
City of Bloomfield
Close: Dec 3, 2025
The project consists of replacing the 1,000,000-gallon water storage tank known as the West Tank or Wilderness Tank.
AvailableCity of Aztec
Work includes approx 16 HR potholing; 10 LF 4" C900 water pipe; 900 LF 12" C900 DR-11 water main by trenched; 1 LS D110 Type III water tank; 1 LS booster station pipe replacement. See attached file.
Posted Date
Nov 10, 2025
Due Date
Dec 8, 2025
Release: Nov 10, 2025
City of Aztec
Close: Dec 8, 2025
Work includes approx 16 HR potholing; 10 LF 4" C900 water pipe; 900 LF 12" C900 DR-11 water main by trenched; 1 LS D110 Type III water tank; 1 LS booster station pipe replacement. See attached file.
AvailableSnyderville Basin Water Reclamation District
The work consists of approx. the construction of a 500,000-gallon welded-steel water storage tank involving all civil, mechanical, electrical for system operation as indicated by the contract documents. See outside link for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Snyderville Basin Water Reclamation District
Close: Dec 18, 2025
The work consists of approx. the construction of a 500,000-gallon welded-steel water storage tank involving all civil, mechanical, electrical for system operation as indicated by the contract documents. See outside link for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →