CityNY
Posted
Nov 10, 2026
Jan 16, 2027
MAIN STREET POCKET PARK IMPROVEMENTS RFP
Construction of pocket park improvements, including a new hardscape plaza, seat walls, planters, tensile structure, fencing, lighting, electrical hookups, and planting.
Description: The project includes site demolition, preparation, earthwork, and installation of a concrete retaining wall and concrete pavement. Alternates include site furnishings, landscaping, and installation of a limestone sign within the concrete wall.
City · IN, US
Adjacent opportunities open for bidding right now.
CityNY
Posted
Nov 10, 2026
Jan 16, 2027
Construction of pocket park improvements, including a new hardscape plaza, seat walls, planters, tensile structure, fencing, lighting, electrical hookups, and planting.
CityLA
Posted
-
Nov 24, 2026
Project consists of engineering & construction for milling, base construction, and overlaying the existing city street for its entire length. 201 SY removal of asphalt drives; 122 LF removal of concrete combination curb & gutter; 954 SY removal of concrete walks and drives; 517 SY removal of incidental concrete paving; 105 LF cleaning existing ditches; 334.5 TN asphalt concrete. See attached file.
CityTX
Posted
Nov 5, 2026
Nov 24, 2026
The full-depth reconstruction of approximately 1,600 linear feet of existing roadway, beginning at its intersection with Judge Ely Boulevard and extending westward along Hailey Street. Improvements include the removal and disposal of existing hot mix asphalt pavement, roadway base material, and concrete curb and gutter, followed by preparation and lime stabilization of the underlying subgrade. The proposed roadway section will consist of 7 inches of flexible base material, new concrete curb and gutter, and hot mix asphalt pavement in accordance with the construction plans and specifications. Construction activities shall include necessary grading, compaction, and adjustments to existing improvements to accommodate the proposed roadway elevations and drainage patterns. The Contractor shall coordinate construction sequencing and maintain reasonable access to adjacent properties throughout the project, minimizing disruptions to existing property owners to the extent practical. The project will also require coordination with AEP Texas for overhead electrical utility pole adjustments or relocations, with such utility work to be performed by AEP Texas. The Contractor shall coordinate its construction schedule with the required utility work to minimize conflicts and facilitate timely completion of the roadway improvements.
CountyFL
Posted
Nov 12, 2026
Dec 16, 2026
Work includes 16 EA remove the existing pump, safely store-on site. ; 16 EA install temporary submersible pump, all testing equipment, and discharge piping; 16 EA perform initial (pre-acidization) specific capacity step-drawdown test; 16 EA remove temporary submersible pump & perform a preliminary downhole color video survey to review current conditions; 16 EA post casing brush dynamic downhole color video sruve to review casing integrity; 1 EA perform acidization of the production interval for well sp21; 1 EA perform acidization of the production interval for well stp24; 16 EA if necessary, perform static & dynamic geophysical logging. See attached file.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval