Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to construct Well 5 Treatment. This project will construct an iron and manganese removal treatment facility for the City’s Well 5. Work will include constructing a new filtration building; pyrolusite filtration system; interior and underground piping; concrete backwash tank; tablet chlorination system; HVAC; standby generator; associated electrical, instrumentation, and telemetry improvements; associated appurtenances; site restoration; and testing, commissioning, and training.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
AvailableInstallation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
AvailableApprox. 9 EA Additional treatment no. 1; 9 EA additional treatment no. 2; 2 EA sonar-jet treatment; 7 EA well chemical treatment; 1 LS deep well video inspection. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 9 EA Additional treatment no. 1; 9 EA additional treatment no. 2; 2 EA sonar-jet treatment; 7 EA well chemical treatment; 1 LS deep well video inspection. See outside link.
AvailableInstallation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Installation of chlorination equipment, including electrical, for existing drinking water Well #1 and Well #5.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →