Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 650 LF of power excavation and backfill, 4,700 SF of power asphalt removal and pavement, 650 LF of power traffic control for trenching and paving.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Premium
Access the largest public sector contact database
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableDemolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems. Demolition of existing pump station and construction of a new 3 MGD pump station and associated apparatus and systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis