Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
YT & CF excitation system upgrade.
Posted Date
Dec 19, 2025
Due Date
Feb 16, 2026
Release: Dec 19, 2025
Close: Feb 16, 2026
YT & CF excitation system upgrade.
AvailablePackage 1: Cedar cladding of existing wood stud walls / interior. Materials provided by client. And drywall at Intake room wall and furnace. Materials provided by contractor. Package 2: Sawcut fire wall and install fire door and locked corridor door between Museum and Civic Center. Package 3: Exit lighting and exit signs interior, fire extinguishers, exterior emergency lighting. Package 4: Storefront doors and windows and repairs to existing exit doors. Package 5: Concrete floor finishing. Package 6: Millwork: Reception desk and bookcase.
Posted Date
Jan 6, 2026
Due Date
Jan 30, 2026
Release: Jan 6, 2026
Close: Jan 30, 2026
Package 1: Cedar cladding of existing wood stud walls / interior. Materials provided by client. And drywall at Intake room wall and furnace. Materials provided by contractor. Package 2: Sawcut fire wall and install fire door and locked corridor door between Museum and Civic Center. Package 3: Exit lighting and exit signs interior, fire extinguishers, exterior emergency lighting. Package 4: Storefront doors and windows and repairs to existing exit doors. Package 5: Concrete floor finishing. Package 6: Millwork: Reception desk and bookcase.
This RFP is for the installation of new digital excitation control modules (Basler DECS-250) for three turbine generators at the Winooski One hydro generation plant, including engineering design and documentation updates.
Posted Date
Jan 21, 2026
Due Date
Feb 5, 2026
Release: Jan 21, 2026
Close: Feb 5, 2026
This RFP is for the installation of new digital excitation control modules (Basler DECS-250) for three turbine generators at the Winooski One hydro generation plant, including engineering design and documentation updates.
AvailableWater purification plant lime transfer system electrical & control improvements.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
Water purification plant lime transfer system electrical & control improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis