Summary
•Removal and disposal of an existing coal fired boiler, piping, augers, flue, appurtenances, etc. •Removal and disposal heat pumps, piping, etc. •Removal and disposal of existing heating water solution and replacement with new glycol solution. •Provide two (2) LP fired boilers with all piping, wiring, valves, appurtenances, equipment, ventilation, etc. Boilers will be set on a new housekeeping pad. •Provide onsite 18,000-gallon LP storage tank/facility, provide underground LP gas line, electric vaporizer, underground electric lines, etc. •Provide new heating water pumps on a new housekeeping pad, piping, valves, etc. •Remove existing wiring, conduit, equipment, etc. that has been identified for removal. •Installation of new destratification fans and associated controls (Add Alternate 1). •Replacement of existing hot water unit heaters with new and additional hot water unit heaters and associated Building Automation System controls (Add Alternate 2). •Provide all necessary electrical improvements including wiring, conduit, equipment, etc. for the proposed and future equipment. Work may include but not limited to, removal of existing equipment, mechanical and electrical components. Contractor will need to repair/patch all floors, wall & roof penetrations that were left from the equipment that is removed. Contractor shall provide housekeeping pads and cut existing concrete surfacing and patch to install new LP gas line and underground electric lines. Contractor shall provide electrical wiring, conduit, equipment for the proposed and future equipment/facilities. Contractor will also need to provide site grading and surfacing for the LP storage tank. Additionally, the Contractor will be responsible for all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents.