Special DistrictTX
Posted
-
Oct 20, 2026
Lift Station Nos. 1 and 2 Rehabilitation RFP
Work includes aprox 1 LS lift station no. 1; 1 LS lift station no. 2.
Description: The objective of the project is to make spot repairs to approximately 22 miles of interior lining to various Bay Division Pipelines; install isolation valves to enhance safe pipeline entry; upgrade approximately 29 service connections; and make minor as-needed repairs. The work is to be performed in the Counties of San Mateo, Santa Clara, and Alameda, California.
SpecialDistrict · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from San Francisco Public Utilities Commission.
Adjacent opportunities open for bidding right now.
Special DistrictTX
Posted
-
Oct 20, 2026
Work includes aprox 1 LS lift station no. 1; 1 LS lift station no. 2.
Uintah Basin Association Of Governments
Special DistrictUT
Posted
Oct 6, 2026
Oct 19, 2026
Work consists of canal channel improvements, installation of approx 90,000 SF of geocomposite canal liner with approx 71,000 SF of 3.5" thick cementitious cover, with alternatives of shotcrete or concrete material, along approx 2,250 LF of canal.
CountyFL
Posted
Sep 28, 2026
Oct 21, 2026
Perform inspections, preventive maintenance, regular repair service, and on-call emergency repair service, for bay doors at thirty-two (32) locations throughout county. Based on County needs, the County may delete doors or add doors to the contract, or change the frequency of inspections. Doors covered by the contract include rollup doors, sectional doors, fourfold doors, electrical operators, personnel doors, and security doors.
CityNH
Posted
-
Nov 4, 2026
Seeking a qualified contractor to line approx. , 1700 LF of 8" to 10" sewer main and 2,500 LF of 12" to 18" drainpipe, chemical grouting lateral sewer connections, bypass pumping for maintenance of sewer flows; 1,200 LF of sewer - cured-in-place pipe lining 8" pipe; 2,000 LF of drain - cured-in-place pipe lining 12" pipe; 8 EA of sewer - chemical sealing of lateral connections to the sewer mainline; bypass pumping for maintenance of sewer flows; heavy cleaning (as ordered by the engineer); provide all materials, equipment, labor and incidentals for the installation and testing of UV cured in-place pipe (CIPP) lining within an existing host pipe; the UVCIPP liner installation shall consist of inserting a resin-impregnated flexible tube into an existing sewer main or pipe culvert, expanding the tube out against the inner walls of the existing sewer pipe or pipe culvert, and curing the tube to form a pipe liner. See attached file.