Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of six (6) hyperboloid mixers for the West Boise Water Renewal Facility (WBWRF) Aeration Basin to replace existing axial flow mixers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Design, fabricate and deliver hyperboloid mixers for use at West Boise Water Renewal Facility (WBWRF), including related work called out in the specifications. This equipment procurement involves replacement of (6) axial flow mixers with hyperboloid style mixers to minimize or eliminate air entrainment into the basin zone.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Design, fabricate and deliver hyperboloid mixers for use at West Boise Water Renewal Facility (WBWRF), including related work called out in the specifications. This equipment procurement involves replacement of (6) axial flow mixers with hyperboloid style mixers to minimize or eliminate air entrainment into the basin zone.
AvailablePurchase of (2) sludge mixers to replace existing mixers.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Purchase of (2) sludge mixers to replace existing mixers.
AvailableWater pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
AvailableThe existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
Posted Date
Dec 4, 2025
Due Date
Jan 8, 2026
Release: Dec 4, 2025
Close: Jan 8, 2026
The existing aeration basin is a four-quadrant rectangular concrete structure with diffuser aeration system in all quadrants. This project involves replacement of aeration diffuser grid system in two quadrants of the four quadrant aeration basin. Replacement includes aeration piping, fittings, supports, diffusers and all appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis