Summary
Waterline Upgrade From Wellfield to Ground Storage Tank. Waterline Improvements - Line A: 4,530.00 LF Proposed 16" PVC C900 SDR 18 Water Main; 64.00 LF Proposed 12" PVC C900 SDR 18 Water Main; 110.00 LF Directional Bore & Install 16" PE DR11 Waterline; 4.00 EA 16" x 12" Tee; 5.00 EA 12" x 12" Tee; 9.00 EA 16" Butterfly Valve and Box; 4.00 EA 12" Gate Valve and Box; 2.00 EA 16" x 45° Bend; 2.00 EA 16" x 22.5° Bend; 1.00 EA 16" x 12" Reducer; 5.00 EA 12" Interconnection; 3.00 EA 2" Air Release/Vacuum Valve; 2.00 EA PVC to PE Transition; 20.00 LF Remove and Replace Fence; 1.00 LS Hydrostatic Pressure Test and Disinfection; 1.00 LS Mobilization; 1.00 LS Erosion Control. Waterline Improvements - Line B: 21,460.00 LF Proposed 16" PVC C900 SDR 18 Water Main; 34.00 LF Proposed 12" PVC C900 SDR 18 Water Main; 900.00 LF Directional Bore & Install 16" PE DR11 Waterline; 185.00 LF Bore and Install 24" Steel Casing; 170.00 LF Slick Bore; 1.00 EA 24" x 16" Tapping Sleeve and Box; 2.00 EA 16" x 16" Tee; 2.00 EA 16" x 12" Tee; 5.00 EA 12" x 12" Tee; 12.00 EA 16" Butterfly Valve and Box; 15.00 EA 12" Gate Valve and Box; 1.00 EA 16" x 90° Bend; 5.00 EA 12" x 90° Bend; 4.00 EA 16" x 12" Reducer; 6.00 EA. 12" Interconnection; 2.00 EA. 12" Cut & Plug; 12.00 EA 2" Air Release/Vacuum Valve; 4.00 EA 2" Blow Off Assembly; 12.00 EA PVC to PE Transition; 54.00 SY Remove and Replace Gravel Driveway; 1.00 LS Hydrostatic Pressure Test and Disinfection; 1.00 LS Mobilization; 1.00 LS Erosion Control; 1.00 LS Construction Signage and Traffic Control. 1.00 LS SCADA Improvements.