Summary
The project includes but is not limited to outfitting two (2) new production wells, installing a new water treatment plant, and upgrades to the existing water treatment plant. The work also includes installing a new pre-engineered post-frame metal treatment plant building with a new packaged treatment unit, new high service pumps, replacement of two existing high service pumps at the existing water treatment plant, a new gas chlorination system, a new phosphate feed system, a new backwash waste holding tank, altitude valve, site improvements, replacement of select existing equipment, and all other work required for the completion of the project. The project includes but is not limited to the installation of approx. 3,050 LF of 8" water main via horizontal directional drill.