Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Ste. Genevieve
Work includes water treatment plant roof repair.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Papillion
Full removal and replacement of approximately 4000 SF of existing roof systems down to structural deck. Various repair work in conjunction with roof system removal and associated electrical and mechanical work as required.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
City of Papillion
Close: Nov 25, 2025
Full removal and replacement of approximately 4000 SF of existing roof systems down to structural deck. Various repair work in conjunction with roof system removal and associated electrical and mechanical work as required.
AvailableOklahoma Department of Transportation
Work includes clean and prep existing clarifiers and flow splitter. Application of polyurethane liner for a completely waterproof seal of the clarifiers and flow splitter. Perform maintenance on all existing plant equipment, and repair any equipment if needed. Re-start up the plant and verify instrumentation and controls are performing at optimal performance.
Posted Date
Oct 15, 2025
Due Date
Dec 4, 2025
Release: Oct 15, 2025
Oklahoma Department of Transportation
Close: Dec 4, 2025
Work includes clean and prep existing clarifiers and flow splitter. Application of polyurethane liner for a completely waterproof seal of the clarifiers and flow splitter. Perform maintenance on all existing plant equipment, and repair any equipment if needed. Re-start up the plant and verify instrumentation and controls are performing at optimal performance.
AvailableMahanoy Township (Water) Authority
Purchase of water treatment plant chemicals for the year 2026
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Mahanoy Township (Water) Authority
Close: Dec 17, 2025
Purchase of water treatment plant chemicals for the year 2026
AvailableCity of Vinton
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
Posted Date
Oct 10, 2025
Due Date
Dec 11, 2025
Release: Oct 10, 2025
City of Vinton
Close: Dec 11, 2025
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis