Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project includes the following Work: Replacement of the existing motor control centers at the water treatment plant, replacement of the existing Well No. 3 underground feeders, and upgrades to the existing supervisory control and data acquisition system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construct new water treatment plant.
Posted Date
Jan 1, 2026
Due Date
Jan 29, 2026
Release: Jan 1, 2026
Close: Jan 29, 2026
Construct new water treatment plant.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
Work include construction of all electrical improvements associated with the proposed water treatment plant and raw water pump station.
AvailableWork consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
Work consists of: demolition of existing Filter Control Building, filter valves, operators, electircal conduit, wire, PLC and SCADA systems, and installation of a new Filter Control Building, UPS Shed, Filter Valves, bridge crane system, PLC, UPS, and SCADA systems, and extensive electrical conduit and wire modifications at the Reservoir 1 Water Treatment Plant. Work includes structural concrete, wood structures, mechanical valves and piping, electrical equipment, conduit, wiring, and PLC and SCADA systems and other modifications.
AvailableWork includes wastewater treatment plant improvements electrical equipment.
Posted Date
Jan 22, 2026
Due Date
Feb 23, 2026
Release: Jan 22, 2026
Close: Feb 23, 2026
Work includes wastewater treatment plant improvements electrical equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →