Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 500,000-gal. capacity elevated reservoir, including all appurtenances, site work, and installation of connecting water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of a 500,000-gal. capacity elevated reservoir, including all appurtenances, site work, and installation of connecting water main.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Construction of a 500,000-gal. capacity elevated reservoir, including all appurtenances, site work, and installation of connecting water main.
AvailablePremium
Access the largest public sector contact database
This project includes the construction of a new 1.5 million gallon composite elevated water tower. This project also includes the water main, valves and other appurtenances, controls, tank control valve, electrical connections, water fill station, drainage, pavement, and site fencing as specified. Supplemental to this New Paradise tower, a tank control valve will need to be installed offsite to control flows for the existing Plank tower. Lastly, this project will include the demolition and removal of the existing Paradise water tower adjacent to the new tower site as well as the demolition and removal of the offsite Frame standpipe. The demolition will include the disconnection of any and all utility services as necessary.
Posted Date
Nov 11, 2025
Due Date
Dec 15, 2025
Release: Nov 11, 2025
Close: Dec 15, 2025
This project includes the construction of a new 1.5 million gallon composite elevated water tower. This project also includes the water main, valves and other appurtenances, controls, tank control valve, electrical connections, water fill station, drainage, pavement, and site fencing as specified. Supplemental to this New Paradise tower, a tank control valve will need to be installed offsite to control flows for the existing Plank tower. Lastly, this project will include the demolition and removal of the existing Paradise water tower adjacent to the new tower site as well as the demolition and removal of the offsite Frame standpipe. The demolition will include the disconnection of any and all utility services as necessary.
AvailableWork consists of exterior painting of a 300,000 Gallon water tower.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work consists of exterior painting of a 300,000 Gallon water tower.
AvailableRemove and dispose of 250,000-gallon water tower; including, but not limited to: water tower and foundation removal, building foundation removal, traffic control, landscaping rock removal, concrete retaining wall removal, asphalt surfacing removal, and site grading.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Remove and dispose of 250,000-gallon water tower; including, but not limited to: water tower and foundation removal, building foundation removal, traffic control, landscaping rock removal, concrete retaining wall removal, asphalt surfacing removal, and site grading.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis