Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work involves the replacement of two existing booster pumping stations, installation of a new booster pumping station, the installation of two new booster chlorine buildings, scada and other appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide EHRM Infrastructure Upgrades Phase 2 Construction.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Provide EHRM Infrastructure Upgrades Phase 2 Construction.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The Project consists of Contract #1-constructing three pickleball courts with stone base, 2 1/2" of 19mm, 1 1/2” of 9.5FG, ADA walkway, fencing, painting court, and installation of nets; Contract #2-installing a metal roof on Pavilion C and soffit/facia on all three pavilions; and Contract #3-installing and connecting solar panels on the 3 pavilions at Park.
AvailablePerform senior center energy conservation upgrades including the purchase and installation of an air source heat pump and a heat pump water heater at the senior center.
Posted Date
Jan 13, 2026
Due Date
Feb 4, 2026
Release: Jan 13, 2026
Close: Feb 4, 2026
Perform senior center energy conservation upgrades including the purchase and installation of an air source heat pump and a heat pump water heater at the senior center.
AvailableDesign-Build services for HVAC System Upgrades at the Judicial Center.
Posted Date
-
Due Date
Mar 3, 2026
Close: Mar 3, 2026
Design-Build services for HVAC System Upgrades at the Judicial Center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →