Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
London Community Service Dist
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Alma
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
Posted Date
Nov 17, 2025
Due Date
Dec 2, 2025
Release: Nov 17, 2025
City of Alma
Close: Dec 2, 2025
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Winnebago Tribe of Nebraska, Blackhawk Community Center
The project includes replacement of a water storage tank access hatch and vent, installation of a tank mixer, and inlet piping. The total contract price will not be increased without prior authorization from the Owner via the change order process.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Winnebago Tribe of Nebraska, Blackhawk Community Center
Close: Dec 9, 2025
The project includes replacement of a water storage tank access hatch and vent, installation of a tank mixer, and inlet piping. The total contract price will not be increased without prior authorization from the Owner via the change order process.
AvailableVillage of Elburn
Well elevated water storage tank rehabilitation consists of furnishing all labor, machinery, tools, rigging, brushes, material, equipment, bonds, and insurance necessary to construct containment, modify, clean, contain, abrasive blast, and paint the interior and exterior of a 250,000 gal. and a 750,000 gal. elevated tank, respectively. The work also includes disinfection and sampling as required to place the elevated tanks back in service.
Posted Date
-
Due Date
Dec 5, 2025
Village of Elburn
Close: Dec 5, 2025
Well elevated water storage tank rehabilitation consists of furnishing all labor, machinery, tools, rigging, brushes, material, equipment, bonds, and insurance necessary to construct containment, modify, clean, contain, abrasive blast, and paint the interior and exterior of a 250,000 gal. and a 750,000 gal. elevated tank, respectively. The work also includes disinfection and sampling as required to place the elevated tanks back in service.
AvailableVillage of Elburn
Well elevated water storage tank rehabilitation consists of furnishing all labor, machinery, tools, rigging, brushes, material, equipment, bonds, and insurance necessary to construct containment, modify, clean, contain, abrasive blast, and paint the interior and exterior of a 250,000 gal. and a 750,000 gal. elevated tank, respectively. The work also includes disinfection and sampling as required to place the elevated tanks back in service.
Posted Date
-
Due Date
Dec 5, 2025
Village of Elburn
Close: Dec 5, 2025
Well elevated water storage tank rehabilitation consists of furnishing all labor, machinery, tools, rigging, brushes, material, equipment, bonds, and insurance necessary to construct containment, modify, clean, contain, abrasive blast, and paint the interior and exterior of a 250,000 gal. and a 750,000 gal. elevated tank, respectively. The work also includes disinfection and sampling as required to place the elevated tanks back in service.