CityGA
Posted
-
Dec 17, 2026
Wastewater System Improvements to Serve the Downrange Industrial Park RFP
The work shall generally consist of furnishing all products and performing all labor necessary to construct the following: Installation of submersible wastewater pumps (2) in an existing wet well, control panel, generator, 12" station piping, valves, bypass connection, connection to existing 16" force main, site work, fencing, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. Time allotted for completion of work is 300 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.