Summary
Work includes 3,160 LF directional bore & install 12" pe SDR 11 water main; 3,550 LF directional bore & install 6" PE SDR 11 water main; 80 LF directional bore & install 4" pe sdr 11 water main; 52 LF directional bore & install 3" pe sdr 11 water main; 90 LF directional bore & install 2" pe sdr 11 water main; 5 EA remove fire hydrant; 14 ea 6" fire hydrant assembly; 3 EA 12"x12" tee; 1 EA 12"x3" tapping saddle; 4 EA 12"x2" tapping saddle; 1 EA 8"x8" tapping sleeve & valve; 4 EA 8" insertion valve; 3 EA 6" cut & plug; 2 EA 6" interconnectin; 2 ea 12"x8" reducer; 1 EA 12"x6" reducer; 3 EA 1" air/vacuum release valve. See attached file.