Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Ground water well, chemical/piping building, diesel generator, site work and other appurtenances and incidentals necessary to provide a complete installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableWater system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Water system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
AvailableConstruction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
AvailableConstruction of a transmission line, water well electrical service, and associated appurtenances.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
Construction of a transmission line, water well electrical service, and associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis