City of Charlotte
This project entails the furnishing and installation of a new 200,000 gal. Bolted steel groundwater storage tank, concrete ring foundation and necessary piping and appurtenances to tie the ground storage tank into the existing water plant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Alma
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
Posted Date
Nov 17, 2025
Due Date
Dec 2, 2025
Release: Nov 17, 2025
City of Alma
Close: Dec 2, 2025
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
AvailableWinnebago Tribe of Nebraska, Blackhawk Community Center
The project includes replacement of a water storage tank access hatch and vent, installation of a tank mixer, and inlet piping. The total contract price will not be increased without prior authorization from the Owner via the change order process.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Winnebago Tribe of Nebraska, Blackhawk Community Center
Close: Dec 9, 2025
The project includes replacement of a water storage tank access hatch and vent, installation of a tank mixer, and inlet piping. The total contract price will not be increased without prior authorization from the Owner via the change order process.
AvailableSouth Central Connecticut Regional Water Authority
Work include replacement of the existing tank mixing systems at six drinking water storage tanks including mixer, the mixer control center, electrical junction boxes, conduit, wire, associated electrical work, and in-service sediment removal and disposal from the interior of each water storage tank using remote operated vehicle prior to placing the new mixing system in service.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
South Central Connecticut Regional Water Authority
Close: Dec 5, 2025
Work include replacement of the existing tank mixing systems at six drinking water storage tanks including mixer, the mixer control center, electrical junction boxes, conduit, wire, associated electrical work, and in-service sediment removal and disposal from the interior of each water storage tank using remote operated vehicle prior to placing the new mixing system in service.
AvailableCity of Granby
Contract 1: construction of approx. 71,000 LF of renewal water lines in various locations. The lines will generally consist of PVC class 200 pipes ranging in size from 8" down to 2" pipe along with all necessary fittings, valves, and fire and flush hydrants and all final cleanup and site restoration. Work will also include the renewal of up to approx. 600 associated service line connections and up to approx. 300 associated new water meter sets. Work will also include the installation of a standby electrical generator set at the location of the existing system well #2. contract 2: construction of a new 200,000-gal. elevated spheroid welded steel water storage tank with an overflow height of approx. 99'. The tower will be installed on the site of the existing well #2. Work to include all necessary foundations, steel fabrication and erection, painting, and final disinfection of the new tank.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
City of Granby
Close: Dec 18, 2025
Contract 1: construction of approx. 71,000 LF of renewal water lines in various locations. The lines will generally consist of PVC class 200 pipes ranging in size from 8" down to 2" pipe along with all necessary fittings, valves, and fire and flush hydrants and all final cleanup and site restoration. Work will also include the renewal of up to approx. 600 associated service line connections and up to approx. 300 associated new water meter sets. Work will also include the installation of a standby electrical generator set at the location of the existing system well #2. contract 2: construction of a new 200,000-gal. elevated spheroid welded steel water storage tank with an overflow height of approx. 99'. The tower will be installed on the site of the existing well #2. Work to include all necessary foundations, steel fabrication and erection, painting, and final disinfection of the new tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis