Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed project consists of approx. 1,450 LF of 4” water line, 3 main line master meter arrangements and all appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water system imp.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Water system imp.
AvailablePremium
Access the largest public sector contact database
The project will consist of the following approximate bid items/quantities: lump sum mobilization, 1400 GPM production well, and additional production well depth and steel casing allowance of 50 VF and additional production well screen length allowance and 25 VF additional production well lap pipe length allowance. Lump sum values for chemical building, chlorination equipment, chlorine injection pit, phosphate equipment, yard piping, electrical work, SCADA system, stie earthwork (includes crushed stone access road), erosion control and 500 ft. of temporary silt fence and chain link fencing.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: lump sum mobilization, 1400 GPM production well, and additional production well depth and steel casing allowance of 50 VF and additional production well screen length allowance and 25 VF additional production well lap pipe length allowance. Lump sum values for chemical building, chlorination equipment, chlorine injection pit, phosphate equipment, yard piping, electrical work, SCADA system, stie earthwork (includes crushed stone access road), erosion control and 500 ft. of temporary silt fence and chain link fencing.
AvailableThe project will consist of the following approximate bid items/quantities: 500,000 elevated storage tank and foundation along with site work required for tank foundation and miscellaneous appurtenant items, yard piping and 25 tons of stone riprap.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: 500,000 elevated storage tank and foundation along with site work required for tank foundation and miscellaneous appurtenant items, yard piping and 25 tons of stone riprap.
AvailableConstruction of a water distribution line: installation of approx. 1,400 lf of 12" PVC (C-200) water main with tracer wire, directional-bored HDPE encasement and 12" HDPE carrier pipe, associated valves, fittings, machine tap, erosion/silt controls, traffic maintenance, resurfacing and related site work.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Construction of a water distribution line: installation of approx. 1,400 lf of 12" PVC (C-200) water main with tracer wire, directional-bored HDPE encasement and 12" HDPE carrier pipe, associated valves, fittings, machine tap, erosion/silt controls, traffic maintenance, resurfacing and related site work.