Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a water distribution line: installation of approx. 1,400 lf of 12" PVC (C-200) water main with tracer wire, directional-bored HDPE encasement and 12" HDPE carrier pipe, associated valves, fittings, machine tap, erosion/silt controls, traffic maintenance, resurfacing and related site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12" pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12" HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12" HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8" machine tap (includes valve and box) (1 each).
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12" pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12" HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12" HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8" machine tap (includes valve and box) (1 each).
AvailableThe Clayton Village Water Association solicitation is for construction of the 2024 SRF Water System Improvements — Contract 3 (distribution line) in Clayton Village, Starkville, MS, including pipeline, directional boring, resurfacing, and associated site work. A pre-bid conference is scheduled for December 2, 2025 at 10:00 AM and bids are due December 16, 2025.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The Clayton Village Water Association solicitation is for construction of the 2024 SRF Water System Improvements — Contract 3 (distribution line) in Clayton Village, Starkville, MS, including pipeline, directional boring, resurfacing, and associated site work. A pre-bid conference is scheduled for December 2, 2025 at 10:00 AM and bids are due December 16, 2025.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableWork include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town s existing water distribution system.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work include construction of new watermains, appurtenances, water service lines, meter vaults, installation of water meters, and installation of new water tank aeration system to improve and extend the town s existing water distribution system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis