Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clayton Village Water Association
The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12" pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12" HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12" HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8" machine tap (includes valve and box) (1 each).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Clayton Village Water Association
1 LS mobilization; 1 LS maintance of traffic; 500 LF temporary silt fence; 200 LF wattles; 1 LS clearing and grubbing; 1,400 LF seeding nad mulching main line; 110CY stone/gravel resurfacing; 15 CY select borrow material; 20 SY bituminious resurfacing; 53 each pipeline and valve ID markers; 3 each heavy duty tracer wire test station; 2 each tracing wire grounding anode; 1,400 LF 12" PVC (CL200) water pipe line ( includes tracer wire); 120 LF directional bored HDPE DR11 encasement for 12: HDPE DR11 waterline; 160 LF 12" HDPE DR11 carrier pipe for bored encasement (includes adapters); 460 LB DIP fittings, MJ C153 compact; 1 each 8" machine tap (includes valve and box).
Posted Date
Nov 21, 2025
Due Date
Dec 11, 2025
Release: Nov 21, 2025
Clayton Village Water Association
Close: Dec 11, 2025
1 LS mobilization; 1 LS maintance of traffic; 500 LF temporary silt fence; 200 LF wattles; 1 LS clearing and grubbing; 1,400 LF seeding nad mulching main line; 110CY stone/gravel resurfacing; 15 CY select borrow material; 20 SY bituminious resurfacing; 53 each pipeline and valve ID markers; 3 each heavy duty tracer wire test station; 2 each tracing wire grounding anode; 1,400 LF 12" PVC (CL200) water pipe line ( includes tracer wire); 120 LF directional bored HDPE DR11 encasement for 12: HDPE DR11 waterline; 160 LF 12" HDPE DR11 carrier pipe for bored encasement (includes adapters); 460 LB DIP fittings, MJ C153 compact; 1 each 8" machine tap (includes valve and box).
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Grand Tower
Project consists of water distribution system improvements.
Posted Date
Oct 16, 2025
Due Date
Dec 2, 2025
Release: Oct 16, 2025
Township of Grand Tower
Close: Dec 2, 2025
Project consists of water distribution system improvements.
AvailableTown of Hampstead
The Town of Hampstead seeks bids for the Water Distribution System Improvements 2026 project to install a temporary bypass water service system and construct water lines on Old Field Lane, Hampshire Road, and Sunder Drive. Work includes installing approximately 680 feet of 6-inch DIP, a new water main, hydrant and services, testing, and traffic control, and a mandatory pre-bid meeting is scheduled for 11/4/2025.
Posted Date
Oct 6, 2025
Due Date
Dec 4, 2025
Release: Oct 6, 2025
Town of Hampstead
Close: Dec 4, 2025
The Town of Hampstead seeks bids for the Water Distribution System Improvements 2026 project to install a temporary bypass water service system and construct water lines on Old Field Lane, Hampshire Road, and Sunder Drive. Work includes installing approximately 680 feet of 6-inch DIP, a new water main, hydrant and services, testing, and traffic control, and a mandatory pre-bid meeting is scheduled for 11/4/2025.
AvailableClayton Village Water Association
The project will consist of the following approximate bid items/quantities: lump sum mobilization, 1400 GPM production well, and additional production well depth and steel casing allowance of 50 VF and additional production well screen length allowance and 25 VF additional production well lap pipe length allowance. Lump sum values for chemical building, chlorination equipment, chlorine injection pit, phosphate equipment, yard piping, electrical work, SCADA system, stie earthwork (includes crushed stone access road), erosion control and 500 ft. of temporary silt fence and chain link fencing.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Clayton Village Water Association
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: lump sum mobilization, 1400 GPM production well, and additional production well depth and steel casing allowance of 50 VF and additional production well screen length allowance and 25 VF additional production well lap pipe length allowance. Lump sum values for chemical building, chlorination equipment, chlorine injection pit, phosphate equipment, yard piping, electrical work, SCADA system, stie earthwork (includes crushed stone access road), erosion control and 500 ft. of temporary silt fence and chain link fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →