Retrieving RFP details
Release
Close
Township of Grand Tower
Project consists of water distribution system improvements.
Town of Southampton
2025 bay drive water quality improvements phase 2.
City of Potwin
Water system improvements: rehabilitation of the water tower.
City of Tescott
Provide water supply system improvements - phase 1. Work includes furnishing all the materials, and equipment for construction of a split faced block building; excavation; backfilling; grading; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; electrical power upgrades; valves, meters, hydrants, & appurtenances; liquid chlorine equipment; submersible well pumps; well pitless units; water well inspections and improvements at both wells; backup generator; piping; installation of 3" & 4" PVC piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Release
Oct 16, 2025
Close
Dec 02, 2025