Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clayton Village Water Association
The project will consist of the following approximate bid items/quantities: lump sum mobilization, 1400 GPM production well, and additional production well depth and steel casing allowance of 50 VF and additional production well screen length allowance and 25 VF additional production well lap pipe length allowance. Lump sum values for chemical building, chlorination equipment, chlorine injection pit, phosphate equipment, yard piping, electrical work, SCADA system, stie earthwork (includes crushed stone access road), erosion control and 500 ft. of temporary silt fence and chain link fencing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clayton Village Water Association
The project will consist of the following approximate bid items/quantities: 500,000 elevated storage tank and foundation along with site work required for tank foundation and miscellaneous appurtenant items, yard piping and 25 tons of stone riprap.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Clayton Village Water Association
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: 500,000 elevated storage tank and foundation along with site work required for tank foundation and miscellaneous appurtenant items, yard piping and 25 tons of stone riprap.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clayton Village Water Association
The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12" pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12" HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12" HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8" machine tap (includes valve and box) (1 each).
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Clayton Village Water Association
Close: Dec 16, 2025
The project will consist of the following approximate bid items/quantities: mobilization (1 ls), maintenance of traffic (1 ls), temporary silt fence (500 lf), wattles (200 lf), clearing and grubbing (1 ls), seeding and mulching, main line (1400 lf), stone/gravel resurfacing (10 cy), select borrow material (15 cy), bituminous resurfacing (20 sy), pipeline and valve id markers (53 each), 12" pvc (cl200 water pipe line (includes tracer wire) (1400 lf), directional bored HDPE DR11 encasement for 12" HDPE DR11 waterline and roadway crossing (includes bore and encasement) (carrier pipe separate pay item), 12" HDPE DR11 carrier pipe for bored encasement (includes adapters) (120 lf), DIP fittings, MS C153 compact (460 lb), and 8" machine tap (includes valve and box) (1 each).
AvailableTown of Elkin
Contract 2, Water Transmission Main includes the replacement and upsizing of nearby water main supply lines, involving approx 5,000 LF of 12" ductile iron pipe (DIP) water main, 2,850 LF of 10" DIP water main.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Town of Elkin
Close: Jan 15, 2026
Contract 2, Water Transmission Main includes the replacement and upsizing of nearby water main supply lines, involving approx 5,000 LF of 12" ductile iron pipe (DIP) water main, 2,850 LF of 10" DIP water main.
AvailableCity of Inglewood
Supply and Delivery of Water Distribution System Materials
Posted Date
Nov 20, 2025
Due Date
Dec 20, 2025
Release: Nov 20, 2025
City of Inglewood
Close: Dec 20, 2025
Supply and Delivery of Water Distribution System Materials
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →