Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clayton Village Water Association
The project will consist of the following approximate bid items/quantities: 500,000 elevated storage tank and foundation along with site work required for tank foundation and miscellaneous appurtenant items, yard piping and 25 tons of stone riprap.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of North Chicago
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
City of North Chicago
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Breese
Project includes the following work: installation of a new 300,000 - Gallon single pedestal elevated water storage tank.
Posted Date
Oct 12, 2025
Due Date
Dec 3, 2025
Release: Oct 12, 2025
City of Breese
Close: Dec 3, 2025
Project includes the following work: installation of a new 300,000 - Gallon single pedestal elevated water storage tank.
AvailableCity of Geneseo
Project consists of painting and repairs to the 500,000-gallon elevated water storage tank.
Posted Date
Nov 19, 2025
Due Date
Dec 4, 2025
Release: Nov 19, 2025
City of Geneseo
Close: Dec 4, 2025
Project consists of painting and repairs to the 500,000-gallon elevated water storage tank.
AvailableCity of High Point
Work includes of demolition of the elevated storage water tank and site appurtenances. The elevated water storage tank is a 1,000,000 gallon (1mg)) capacity tank that is no longer in use. It consists of a welded steel tank and steel frame.
Posted Date
Nov 3, 2025
Due Date
Dec 10, 2025
Release: Nov 3, 2025
City of High Point
Close: Dec 10, 2025
Work includes of demolition of the elevated storage water tank and site appurtenances. The elevated water storage tank is a 1,000,000 gallon (1mg)) capacity tank that is no longer in use. It consists of a welded steel tank and steel frame.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →