Summary
Approx., 6,200 LF of 12" ductile iron water main, 3,950 LF of 8" ductile iron water main, as well as valves, hydrants, water services from the water main in the public right-of-way to the property line, road surface restoration, and all necessary and incidental appurtenances necessary to complete the water main installation. Furthermore, work includes the installation of seventy-six (76) 1" through 2" water services from the curb stop to the existing interior plumbing, including water meter installations, connections to existing interior plumbing, and disconnection and abandonment of existing private water supply wells.