Summary
The Town of Troutman, North Carolina is soliciting sealed bids for the construction of the Wastewater Transmission System Expansion – Phase 1 project in Iredell County. The scope includes installation of approximately 17,050 LF of 18-inch PVC force main, 1,300 LF of 20-inch HDPE DR 11 force main (HDD), 490 LF of 18-inch DI force main under a rail line, 3,780 LF of 24-inch PVC gravity main, and 120 LF of 24-inch DI gravity main with associated appurtenances. The project's estimated total bid price is approximately $11,000,000 with an expected duration of 365 days, and bids will be received at Troutman Town Hall until Tuesday, August 4, 2026, at 11:00 AM local time.