Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work generally consists of the installation and associated site improvements for a production well and observation well for the city. The water supply well no. 4 improvements project includes all labor, equipment, and materials necessary for construction of the production well, observation well, site grading and installation of gravel drives. Work includes 60 LF pipe culvert, trenched, 12" reinforced concrete; 121 LF pipe culvert, trenched, 18" reinforced concrete; 3,342 SY driveway granular surfacing, Class A crushed stone 6"; 15 TN of riprap erosion stone; 2,000 LF silt fence; 100 LF 18" conductor steel casing. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableRehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
AvailableWater well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Water well pump removal, replacement, disinfection, and testing. The section 2 work to be performed under the base bid provisions of this contract generally consists of the well discharge piping and chlorine disinfection equipment installation, well house SCADA and electrical improvements, well house building improvements, and installation of the 8" diameter water line and appurtenances to create a complete and functioning system.
AvailableThe construction of a water supply well at the station water treatment facility.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The construction of a water supply well at the station water treatment facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis