City of Kalamazoo
Work includes installing carlisle's sure-seal (black) adhered roofing system; remove the ballast and existing membrane fasten down polyisocyanurate to meet R-30. apply the new fully adhered EPDM and install new edge metal.
Water Reclamation Plant Buildings 5 - 6 and 23 Roof Replacements (IFB)
zip
Release
Dec 26, 2024
Close
Jan 28, 2025