Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installing carlisle's sure-seal (black) adhered roofing system; remove the ballast and existing membrane fasten down polyisocyanurate to meet R-30. apply the new fully adhered EPDM and install new edge metal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
Posted Date
Dec 10, 2025
Due Date
Feb 9, 2026
Release: Dec 10, 2025
Close: Feb 9, 2026
Remove the existing layer of PVC Single Ply membrane and existing layer of 3/8” Fanfold recover board, exposing the original BUR: Granular-Surfaced roof assembly. Overlay of the existing original BUR: Granular-Surfaced roof assembly, via mechanical attachment of a 3/8” Fanfold recover board and mechanical attachment of a 50 MIL PVC single ply membrane. PVC Membrane: Contractor shall furnish and install, via mechanical attachment, a white, 50 mil single-ply membrane roofing system that is fabricated of a weft inserted, low-shrink, anti-wicking polyester fabric and has a thermoplastic coating of PVC material laminated to both sides.
AvailableReplacing the roof on Gaines Lodge, ranger residence and five (5) cabins.
Posted Date
Jan 9, 2026
Due Date
Feb 2, 2026
Release: Jan 9, 2026
Close: Feb 2, 2026
Replacing the roof on Gaines Lodge, ranger residence and five (5) cabins.
AvailableWork includes roof replacement for twelve city owned facilities. Removal and replace roof on 12 facilities that include: 2 fire department buildings, 6 park buildings, and 4 public works buildings.
Posted Date
Jan 18, 2026
Due Date
Feb 19, 2026
Release: Jan 18, 2026
Close: Feb 19, 2026
Work includes roof replacement for twelve city owned facilities. Removal and replace roof on 12 facilities that include: 2 fire department buildings, 6 park buildings, and 4 public works buildings.
AvailableProvide roof replacements at five (5) single-family homes.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
Provide roof replacements at five (5) single-family homes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis