Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water pollution control plant improvements. schedules of Work: Contract 2A - General Construction. Contract 2B - HVAC Construction. Contract 2C - Electrical Construction. The Project generally consists of the following: Contract 2A: Headworks - New Influent Pumps, Mechanical Fine Screen, Washer/Compactor, and Aerated Grit System Equipment consisting of Aeration Diffusers, Grit Blowers, Grit Screw Conveyor, Grit Bucket Elevator, and Grit Classifier. Secondary Clarification - New Secondary Clarifier Sludge Collection Mechanisms. Solids handling - New RAS/WAS Pumps, New Digester Tank Aeration Equipment including dedicated Aeration Blowers and Diffusers, Installation of Owner-Purchased Belt Filter Press and Belt Filter Press Feed Pump. General Facility - Supporting process piping and building Architectural and Civil/Site improvements. Contract 2B: Improvements include the demo and installation of new HVAC equipment for the Headworks/Administration Building and Dewatering Building. Contract 2C: Includes removing power to existing process equipment that is to be demolished and connecting all new process equipment including new influent pumps, mechanical fine screen, washer/compactor, aerated grit system, secondary clarifier, RAS/WAS pumps, and aeration blowers for aerobic digesters. Includes furnishing and installing all control wiring for new process equipment associated with Contract 2A. Includes demolishing existing power and connecting all new equipment associated with Contract 2B. New emergency generator, automatic transfer switch, and associated equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Purchase of various chemicals for the Yorktown Water Pollution Control Plant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Purchase of various chemicals for the Yorktown Water Pollution Control Plant.
AvailableWork consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
AvailableWater Treatment Plant Raw Water and Clarification Improvements CMAR.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
AvailableWater treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Close: Jan 8, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis