Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Rehoboth Beach
Work includes the removal and replacement of approx. 363 1" residential water meters; meters and MXUs to be provided by the City.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Newark
Providing water meters ranging from size 5/8" to 12" water meter sizes 5/8" and 1-1/2" will also includes a radio communication with additional remote shutoff capabilities. The work also includes an advanced metering infrastructure (AMI) system that includes radio signal towers, communication software, data storage and training.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
City of Newark
Close: Dec 18, 2025
Providing water meters ranging from size 5/8" to 12" water meter sizes 5/8" and 1-1/2" will also includes a radio communication with additional remote shutoff capabilities. The work also includes an advanced metering infrastructure (AMI) system that includes radio signal towers, communication software, data storage and training.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Southampton
2025 Water Meter Replacement.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Town of Southampton
Close: Dec 17, 2025
2025 Water Meter Replacement.
AvailableCity of Vicksburg
Replace existing water meters. Project includes the furnishing of specified meters, software, hardware, and radios 100% compatible with the current sensus flexnet water & gas meter reading system as part of the project to remove the city s existing water meters and replace with ami water meter system that is fully compatible with the current billing and finance software system.
Posted Date
Dec 3, 2025
Due Date
Jan 23, 2026
Release: Dec 3, 2025
City of Vicksburg
Close: Jan 23, 2026
Replace existing water meters. Project includes the furnishing of specified meters, software, hardware, and radios 100% compatible with the current sensus flexnet water & gas meter reading system as part of the project to remove the city s existing water meters and replace with ami water meter system that is fully compatible with the current billing and finance software system.
AvailableCity of Angels Camp
The City of Angels (Angels Camp, CA) is soliciting proposals for a Water Meter Replacement Project in two phases to replace 1,822 residential water meters with automatic meter reading units furnished by the City. Work includes three levels of meter replacement (simple remove-and-replace, excavation and replacement, and excavation with piping modification) and must be completed within 270 calendar days from Notice to Proceed; the Engineer's Estimate is $2,400,000. A mandatory pre-bid meeting is scheduled for December 16, 2025, and the bid closes on January 8, 2026.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
City of Angels Camp
Close: Jan 8, 2026
The City of Angels (Angels Camp, CA) is soliciting proposals for a Water Meter Replacement Project in two phases to replace 1,822 residential water meters with automatic meter reading units furnished by the City. Work includes three levels of meter replacement (simple remove-and-replace, excavation and replacement, and excavation with piping modification) and must be completed within 270 calendar days from Notice to Proceed; the Engineer's Estimate is $2,400,000. A mandatory pre-bid meeting is scheduled for December 16, 2025, and the bid closes on January 8, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →