Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
work includes approx 3,492 LF of 8" water main installed by directional bore and open cut, hydrants, valves, water service line transfers, surface restoration, seeding, removal of existing hydrants, abandonment of existing water main, surface restoration, seeding and miscellaneous associated work, including cleanup. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project work includes: Description of Work (Phase I): Replacement of approx. 1.51 miles of 8" through 12" water main. 0.7 miles of water house connections to serve Pepsi Place and nearby streets in the Cheverly area of Prince George’s County, Maryland; Description of Work (Phase II): Replacement of approx. 2.33 miles of 8" through 12" water main. 1.4 miles of water house connections to serve Crest Avenue and various streets in the Cheverly area of Prince George’s County, Maryland.
Posted Date
Nov 20, 2025
Due Date
Jan 13, 2026
Release: Nov 20, 2025
Close: Jan 13, 2026
Project work includes: Description of Work (Phase I): Replacement of approx. 1.51 miles of 8" through 12" water main. 0.7 miles of water house connections to serve Pepsi Place and nearby streets in the Cheverly area of Prince George’s County, Maryland; Description of Work (Phase II): Replacement of approx. 2.33 miles of 8" through 12" water main. 1.4 miles of water house connections to serve Crest Avenue and various streets in the Cheverly area of Prince George’s County, Maryland.
AvailableWater Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableWater Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
Posted Date
Dec 1, 2025
Due Date
Jan 13, 2026
Release: Dec 1, 2025
Close: Jan 13, 2026
Water Main Replacement project generally includes the furnishing of all labor, materials, equipment, and incidentals necessary to complete the installation of approx 2,830 LF of new water main infrastructure. The project consists of 430 LF of 16" diameter ductile iron pipe (DIP) with nitrile gaskets, 20 LF of 16" diameter DIP with a 24" diameter casing pipe, 2,300 LF of 16" diameter polyvinyl chloride (PVC) pipe, 60 LF of 8" diameter PVC Pipe, and 20 LF of 12" diameter PVC pipe. Work shall include, but is not limited to, trench excavation and backfill, pipe installation, installation of valves, fittings, hydrants, restrained joints, thrust restraints, air release valves and pits, connections to existing mains, flushing, pressure testing, disinfection, and surface restoration.
AvailableReplacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →