Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of approximately 2,300 LF water main installation (various sizes), including service transfers and all related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailablePremium
Access the largest public sector contact database
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
Posted Date
Dec 14, 2025
Due Date
Jan 20, 2026
Release: Dec 14, 2025
Close: Jan 20, 2026
Water main replacement. This project consists of the replacement of approx 987' and installation of approx 405' of 8" DIP water main, replacement of approx 10' and installation of approx 22' of 10" DIP water main, replacement of approx 55 and installation of approx 54' of 12" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, replacement of approx 2,343' and installation of approx 2,916' of 24" DIP water main, installation of 18 fire hydrants and 125 water house connections.
AvailableApprox., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.