Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide one-time purchase and delivery of various water main repair materials. Includes 20 LF of city part #4614 48" ductile iron cl350 gauged pipe, full 20' joint within 2' of the bell shall have an O.D. of 50.8"; 4 EA of city part #4615 48" MJ bolt pack MJ gasket/bolt and nuts bolt length needs to accommodate a c110 full body fitting, 8.5" from bottom of t-head to end of threads; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Install 2,548 LF of 8", 6", and 4" ductile iron water main, fittings, and hydrants includes 2,450 LF 8" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed, 88 LF 6" Ductile Iron Pipe, Push-On Joint, ANSI/AWWA, C151, Special Thickness Class No. 52, with 8 mil. V-Bio Enhanced Polyethylene Encasement, installed.
AvailableThe approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close: Jan 13, 2026
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
The City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
Release: Nov 18, 2025
Close: Dec 18, 2025
Water main improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis