Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Jones
Work consist of 3,300 LF of 12" pvc water main, 10 LF of 6" PVC water main, 1,410 LF of directional bore & install 12" water main, 35 LF of directional bore & install 6" water main, 8 EA of PVC to pe transition, 55 LF of bore & install 18" steel casing, 450 LF of slick bore, 88 SY of gravel repair, 6 SY of remove & repair concrete, 1 EA of 12" interconnection, 10 EA of 12" gate valve & box, 2,200 SY of solid slab sodding, 7 EA of 6" fire hydrant assembly, 3 EA of 2" air/vacuum release valve. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Borough of Chambersburg
Project consists of water main extension project. See attached file.
Posted Date
Sep 12, 2025
Due Date
Dec 9, 2025
Release: Sep 12, 2025
Borough of Chambersburg
Close: Dec 9, 2025
Project consists of water main extension project. See attached file.
AvailableGilbert-Summit Rural Community Water District
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
Posted Date
Oct 27, 2025
Due Date
Nov 27, 2025
Release: Oct 27, 2025
Gilbert-Summit Rural Community Water District
Close: Nov 27, 2025
6,050 LF - C-900 PVC water main, 8"; 2,577 LF - C-900 PVC water main, 6"; 1 ea - tee, 6"x6" MJ; 5 ea - gate valves W/bos, 8" MJ; 22 ea - service connection, open cut; 1 ea - connect new water main to existing (includes material & labor); 80 LF - steel casing, 12".
AvailableCity of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
City of LaBelle
Close: Dec 16, 2025
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Town of Lochbuie
20" Water main extension, including a bored crossing and related work at the FRICO owned Speer Canal. Additionally, the work included, but is not limited to, earthwork, traffic control, erosion control and stabilization.
Posted Date
Oct 29, 2025
Due Date
Nov 25, 2025
Release: Oct 29, 2025
Town of Lochbuie
Close: Nov 25, 2025
20" Water main extension, including a bored crossing and related work at the FRICO owned Speer Canal. Additionally, the work included, but is not limited to, earthwork, traffic control, erosion control and stabilization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis