Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of a water main extension.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes water main extension.
Posted Date
Jul 1, 2022
Due Date
Feb 3, 2026
Release: Jul 1, 2022
Close: Feb 3, 2026
Work includes water main extension.
AvailablePremium
Access the largest public sector contact database
The project consists of approx 3,119 LF of 6" water main, 3,300 LF of 8" water main, 1,338 LF of 6" water main along multiple corridors. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 20, 2026
Release: Dec 10, 2025
Close: Jan 20, 2026
The project consists of approx 3,119 LF of 6" water main, 3,300 LF of 8" water main, 1,338 LF of 6" water main along multiple corridors. See attached file.
AvailableWater Main Extension. Work includes 1,363 LF of Directional Bore & Install 6" PE SDR 11 Water Main; 539 LF of Directional Bore & Install 8" PE SDR 11 Water Main; 130 LF of Directional Bore & Install 8" PE SDR 9 Water Main; 2 EA 8" Gate Valve & Box; 4 EA 6" Gate Valve & Box; 3 EA Fire Hydrant.
Posted Date
Dec 13, 2025
Due Date
Jan 6, 2026
Release: Dec 13, 2025
Close: Jan 6, 2026
Water Main Extension. Work includes 1,363 LF of Directional Bore & Install 6" PE SDR 11 Water Main; 539 LF of Directional Bore & Install 8" PE SDR 11 Water Main; 130 LF of Directional Bore & Install 8" PE SDR 9 Water Main; 2 EA 8" Gate Valve & Box; 4 EA 6" Gate Valve & Box; 3 EA Fire Hydrant.
AvailableInstallation of 690 LF of proposed DI water main. Various improvements of water mains through the construction of new 8" Ductile Iron Pipe Class 52 Potable Water Mains along with fittings, service connections and components. This new water main system shall connect to the existing infrastructure. As part of the project, the Contractor must perform a tie-in connection to the existing 8" DI pipe utilizing the necessary adaptors to make the watertight connection. Site work scope includes various traffic control devices, soil erosion and sediment control measures, excavation, restoration of asphalt pavement, various driveway restorations, curb restoration, and landscape restorations.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Installation of 690 LF of proposed DI water main. Various improvements of water mains through the construction of new 8" Ductile Iron Pipe Class 52 Potable Water Mains along with fittings, service connections and components. This new water main system shall connect to the existing infrastructure. As part of the project, the Contractor must perform a tie-in connection to the existing 8" DI pipe utilizing the necessary adaptors to make the watertight connection. Site work scope includes various traffic control devices, soil erosion and sediment control measures, excavation, restoration of asphalt pavement, various driveway restorations, curb restoration, and landscape restorations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis