Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of 690 LF of proposed DI water main. Various improvements of water mains through the construction of new 8" Ductile Iron Pipe Class 52 Potable Water Mains along with fittings, service connections and components. This new water main system shall connect to the existing infrastructure. As part of the project, the Contractor must perform a tie-in connection to the existing 8" DI pipe utilizing the necessary adaptors to make the watertight connection. Site work scope includes various traffic control devices, soil erosion and sediment control measures, excavation, restoration of asphalt pavement, various driveway restorations, curb restoration, and landscape restorations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableWork includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Posted Date
Oct 29, 2025
Due Date
Dec 16, 2025
Release: Oct 29, 2025
Close: Dec 16, 2025
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
Work includes approx 320 LF connecting to an existing water main and a hydrant relocation. See outside link.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Work includes approx 320 LF connecting to an existing water main and a hydrant relocation. See outside link.
AvailableWork includes approx: 297 FT of 6" water main; 25 FT of water main encasement, and other collateral work. see outside link
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Work includes approx: 297 FT of 6" water main; 25 FT of water main encasement, and other collateral work. see outside link
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis